OpenMoko Schedule Revised, For X-Mas

Posted by Sander_Marechal on Sep 10, 2007 1:44 AM EDT
Phoronix; By Michael Larabel
Mail this story
Print this story

This past week the Phase 2 "Mass Market" schedule for the OpenMoko Neo1973 was revised. OpenMoko now expects the GTA02v3 design to be finalized by September 20 while on December 10 it will begin production in "moderate volumes". On December 20 the OpenMoko Neo1973 GTA02v3 will go on sale, and with "Santa's Sleigh Package Service", the OpenMoko Neo1973 will arrive on December 25 for those celebrating Christmas.

Full Story

  Nav
» Read more about: Story Type: News Story; Groups:

« Return to the newswire homepage

This topic does not have any threads posted yet!

You cannot post until you login.